General Studies IIGOVERNANCE

BharatNet

Context:

Cabinet approves BharatNet implementation through Public Private Partnership Model in 16 States with optical fibre connectivity to all inhabited villages

Key Highlights:

  • The revised strategy also includes creation, upgradation, operation, maintenance and utilization of BharatNet by the concessionaire who will be selected by a competitive international bidding process. 
  • The estimated maximum viability gap funding approved for the above PPP model is Rs. 19,041 crores.
  • The States covered under the Cabinet approval today are Kerala, Karnataka, Rajasthan, Himachal Pradesh, Punjab, Haryana, Uttar Pradesh, Madhya Pradesh, West Bengal, Assam, Meghalaya, Manipur, Mizoram, Tripura, Nagaland and Arunachal Pradesh. An estimated 3.61 lakh villages including GPs will be covered. 
  • Department of Telecommunication will separately workout the modalities for these (remaining) States/UTs.

  • The PPP Model will leverage Private Sector efficiency for operation, maintenance, utilization and revenue generation and is expected to result in faster roll out of BharatNet.
  • The selected concessionaire (Private Sector Partner) is expected to provide reliable, high speed broadband services as per pre-defined Services Level Agreement (SLA). 
  • Extension of reach of BharatNet to all inhabited villages with reliable, quality, high speed broadband will enable better access of e-services offered by various Central and State Government agencies. 
  • It will also enable online education, telemedicine, skill development, e-commerce and other applications of broadband. It is expected that revenue will be generated from different sources including proliferation of broadband connections to individuals & institutions, sale of dark fibre, Fiberization of mobile towers, e-commerce etc.

  • Proliferation of broadband in rural areas will bridge the rural-urban divide of digital access and accelerate the achievement of Digital India. The penetration and proliferation of broadband is also expected to increase direct and indirect employment and income generation.  The States where PPP Model is envisaged, will facilitate free Right of Way.

BharatNet PPP Model will bring in following consumer friendly advantages:

(a)   Use of innovative technology by the Private Sector Provider for the consumers;

(b)   High quality of service and Service Level to consumers;

(c)   Faster deployment of network and quick connectivity to consumers;

(d)   Competitive tariffs for services;

(e)   Variety of services on high-speed broadband  including Over the top (OTT) services and multi-media services as part of packages offered to consumers, and

(f)    Access to all online services.

PPP Model in this critical infrastructure of Telecom is a novel initiative. The Private Sector Partner is also expected to bring an equity investment and raise resources towards capital expenditure and for operation and maintenance of the network.  Hence, the PPP Model for BharatNet will enhance efficiency, quality of service, consumer experience and leverage private sector expertise, entrepreneurship and capacities for accelerating achievement of digital India.  This will be in addition to substantial savings of public money.

National Optical Fibre Network (NOFN)

National Optical Fibre Network (NOFN) is an ambitious initiative to trigger a broadband revolution in rural areas. NOFN was envisaged as an information super-highway through the creation of a robust middle-mile infrastructure for reaching broadband connectivity to Gram Panchayats.

The National Optical Fibre Network (NOFN) aims to connect all the 2,50,000 Gram panchayats in the country and provide 100 Mbps connectivity to all gram panchayats (GPs). To achieve this, the existing fibres of PSUs (BSNL, Railtel and Power Grid) were utilised and incremental fibre was laid to connect to Gram Panchayats wherever necessary. Dark fibre network thus created was lit by appropriate technology thus creating sufficient bandwidth at the Gram Panchayats.

Non-discriminatory access to the NOFN was provided to all the service providers like Telecom Service Providers (TSPs), ISPs, Cable TV operators and Content providers to launch various services in rural areas. The NOFN project was funded by the Universal Service Obligation Fund (USOF).

Based on NOFN experiences, newer, updated and upgraded version – BharatNet was conceived as a nation-wide broadband network.

BharatNet

Vision

BharatNet is a project of national importance to establish, by 2017, a highly scalable network infrastructure accessible on a non-discriminatory basis, to provide on demand, affordable broadband connectivity of 2 Mbps to 20 Mbps for all households and on demand capacity to all institutions, to realize the vision of Digital India, in partnership with States and the private sector.

The entire project is being funded by Universal service Obligation Fund (USOF), which was set up for improving telecom services in rural and remote areas of the country. The objective is to facilitate the delivery of e-governance, e-health, e-education, e-banking, Internet and other services to the rural India.

Implementation

The project is a Centre-State collaborative project, with the States contributing free Rights of Way for establishing the Optical Fibre Network.  The three-phase implementation of the BharatNet project is as follows

  • The first phase envisages providing one lakh gram panchayats with broadband connectivity by laying underground optic fibre cable (OFC) lines by Decmeber 2017.

  • The second phase will provide connectivity to all 2,50,500 gram panchayats in the country using an optimal mix of underground fiber, fiber over power lines, radio and satellite media. It is to be completed by March 2019. For success in phase-2, which will also involve laying of OFC over electricity poles, the participation of states will be important. This is a new element of the BharatNet strategy as the mode of connectivity by aerial OFC has several advantages, including lower cost, speedier implementation, easy maintenance and utilization of existing power line infrastructure. The last mile connectivity to citizens was proposed to be provided creating Wi-Fi hotspots in gram panchayats
  • In the third phase from 2019 to 2023, state-of-the-art, future-proof network, including fiber between districts and blocks, with ring topology to provide redundancy would be created.
  • As on 31.12.2017, the status of implementation of BharatNet is as under:-
    – No. of GPs where OFC laying is completed : 1,09,926 GPs
    – Optical Fibre Cable laid : 2,54,895 km
    – Broadband Connectivity provided in GPs : 1,01,370 GPs

Leave a Reply